Concrete pouring of foundation

One of the initial stages of construction is the laying of foundation. After pouring concrete and inserting a reinforcement cage in the pile specified in the project, the concrete surface is flattened with a screed. Concrete surface must be flattened precisely in accordance with the height specified by the project designer. A monolithic beam of grillage foundation can be superimposed on properly laid drilling foundation. Before pouring foundation concrete, formwork is installed on the piles from both sides of the reinforcement, then they are poured with concrete and very firmly reinforced to form a grillage beam for proportional distribution of building loads.

Afterwards, formwork is installed from both sides of the reinforcement and concrete is poured into a reinforced formwork. It shall cover the rebar with a safe layer. Power concrete vibrator is used on the concrete, its top surface is horizontally flattened. Since we possess our own construction machinery and pile drilling rig, we can boldly assure the smooth and efficient working process.

Foundation is the only such structure of the building that is so engaged with the soil sinking underneath, therefore, the foundation should be laid only after the performance of local geological engineering investigations and with the drawn-up project.

Concrete pouring of foundation is the construction stage demanding the most responsibility. Type of foundation is selected based on the type of soil, groundwater level, depth of frost, whether the building will contain a basement or not, type of retaining walls, and structural solutions.

Materials used in pouring concrete must conform to the material requirements and certificates of the project. Concrete grade used for concrete pouring of foundation must conform to the project documentation.

It should be noted that foundation must be firm, bear the loads of a building and be supported by a properly prepared and compacted soil. Additionally, the foundation must be properly insulated, as the correct implementation of the project is dependent on it.

AUTOKAJUTA – years of experience and professional knowledge. Responsible outlook to work allows us to offer quality services of concrete pouring of foundation.

Concrete pouring of foundation

One of the initial stages of construction is the laying of foundation. After pouring concrete and inserting a reinforcement cage in the pile specified in the project, the concrete surface is flattened with a screed. Concrete surface must be flattened precisely in accordance with the height specified by the project designer. A monolithic beam of grillage foundation can be superimposed on properly laid drilling foundation. Before pouring foundation concrete, formwork is installed on the piles from both sides of the reinforcement, then they are poured with concrete and very firmly reinforced to form a grillage beam for proportional distribution of building loads.

Afterwards, formwork is installed from both sides of the reinforcement and concrete is poured into a reinforced formwork. It shall cover the rebar with a safe layer. Power concrete vibrator is used on the concrete, its top surface is horizontally flattened. Since we possess our own construction machinery and pile drilling rig, we can boldly assure the smooth and efficient working process.

Foundation is the only such structure of the building that is so engaged with the soil sinking underneath, therefore, the foundation should be laid only after the performance of local geological engineering investigations and with the drawn-up project.

Concrete pouring of foundation is the construction stage demanding the most responsibility. Type of foundation is selected based on the type of soil, groundwater level, depth of frost, whether the building will contain a basement or not, type of retaining walls, and structural solutions.

Materials used in pouring concrete must conform to the material requirements and certificates of the project. Concrete grade used for concrete pouring of foundation must conform to the project documentation.

It should be noted that foundation must be firm, bear the loads of a building and be supported by a properly prepared and compacted soil. Additionally, the foundation must be properly insulated, as the correct implementation of the project is dependent on it.

AUTOKAJUTA – years of experience and professional knowledge. Responsible outlook to work allows us to offer quality services of concrete pouring of foundation.

Advantages of concrete pouring of foundation

Resistance to moisture

If you wish to lay foundation with extruded polystyrene, it shall be moisture-resistant. This type of foundation do not let the water ingress inside the building.

Resistance to cold

If you wish to lay foundation with extruded polystyrene, it shall be cold-resistant). This type of foundation stop the cold and insulate the foundation from every side.

Heaving prevention

When installing buildings it is very important to ensure its longevity and stability against shifting soil and terrain. The prevention of heaving is insured during the laying of foundation.

Shrinkage prevention

When installing buildings it is very important to ensure its longevity and stability against shifting soil and relief). The prevention of shrinkage into soil is insured during the laying of foundation.

The process of concrete pouring of foundation

Determining the drilling location

1

Determining the drilling location

Foundation axes and pile locations are marked according to the project coordinates.

Drilling

2

Drilling

We install the drilling rig and reach the altitude while drilling in accordance with the pile plan.

Withdrawing and pouring concrete

3

Withdrawing and pouring concrete

Concrete pump feeds concrete and the pile is filled with concrete.

Reinforcement

4

Reinforcement

Reinforcement cage is inserted.

Assembling formwork

5

Assembling formwork

Assembling formwork, installing polystyrene foam in the lower section.

Concrete pouring of reinforcement

6

Concrete pouring of reinforcement

Bonding or reinforcement cages, concrete pouring, concrete compressing.

Foundation is ready

7

Foundation is ready

Our job is done. Foundation is ready for further construction of a building.